Service of IZh 2126
1. General information
2. Engine UEPA-331
3. VAZ-2106 engine
3.1. Description of a design
3.2. Oil replacement
3.3. Replacement of laying of a cover of a head of the block of cylinders
3.4. Check and adjustment of thermal gaps in the drive of valves
3.5. Adjustment of a tension of a chain of the drive of the camshaft
3.6. Removal of an uspokoitel of a chain of the drive of the camshaft
3.7. Removal of a natyazhitel of a chain of the drive of the camshaft
3.8. Removal of the camshaft and levers of the drive of valves
3.9. Replacement of maslootrazhatelny caps of the mechanism of gas distribution
3.10. Replacement of a forward epiploon of a bent shaft
3.11. Replacement of a back epiploon of a bent shaft
3.12. Removal of a gear wheel of the drive of the oil pump
3.13. Removal of a chain and asterisks of the drive of the camshaft
3.14. Removal of the roller of the drive of auxiliary units
3.15. Replacement of laying of an inlet pipe and final collector
3.16. Removal and dismantling of a head of the block of cylinders
3.17. Removal of the sensor of pressure of oil
3.18. Removal of an oil separator of system of ventilation of a case
3.19. Removal of support of the power unit on the car with the VAZ-2106 engine
3.20. Replacement of laying of the pallet of a case
3.21. Removal of the oil pump
3.22. Dismantling of the oil pump
3.23. Dismantle of conrod and piston group on the car
3.24. Removal of the engine from the car
3.25. Dismantling and assembly of the engine
4. Cooling system
5. Power supply system
6. Carburetor
7. System of ignition of the engine UEPA-331
8. System of ignition of the VAZ-2106 engine
9. System of production of the fulfilled gases
10. Coupling
11. IZh-2126 transmission
12. VAZ-21074 transmission
13. Cardan transfer
14. Zadny Bridge
15. Forward suspension bracket
16. Back suspension bracket
17. Steering
18. Brake system
19. Electric equipment
20. Body
21. System of ventilation and heating
22. Features of a design of the IZh-2717 car
23. Appendix
24. Care of a car body
 






b678569c



3-24-snyatie-dvigatelya-s-avtomobilya.html

3.24. Removal of the engine from the car

We perform work on a viewing ditch or the elevator.

We remove a cowl (see. "Removal of a cowl").

We disconnect a wire of "weight" from the rechargeable battery.

We merge cooling liquid from the engine (see. "Replacement of cooling liquid on the car with the VAZ-2106 engine") and oil (see. "Oil replacement"). We remove the transmission (see. "Removal of the transmission"), a casing and the conducted clutch plate (see. "Removal of a casing and the conducted clutch plate on the car with the VAZ-2106 engine"), a starter (see. "Removal and dismantling of a starter 35.3708") also we disconnect a reception pipe from a final collector of the engine (see. "Removal of a reception pipe on the car with the VAZ-2106 engine"). We remove a cooling system radiator (see. "Removal of a radiator on the car with the VAZ-2106 engine").

Having weakened fastening collars, we disconnect cooling system hoses from the taking-away branch pipe of a head of the block of cylinders, the bringing branch pipe and the taking-away heater radiator tube.

We remove the case of the air filter (see. "Removal of the case of the air filter"). We disconnect a cable of the drive of the air gate from the carburetor (see. "Removal of a cable of the drive of the air gate of the carburetor"), a cable of the drive of butterfly valves (see. "Removal of a cable of the drive of butterfly valves of the carburetor"), wires from the EPHH microswitch (see. "Removal of the microswitch") and depression supply tubes to an EPHH system elektropneamoklapan (see. "Removal of the electropneumatic valve").

We disconnect a hose of the vacuum amplifier of brakes from the union of an inlet pipe (see. "Replacement of laying of an inlet pipe and final collector"). We disconnect the bringing fuel hose from a branch pipe of the fuel pump (cm, "Removal of the fuel pump on the car with the VAZ-2106 engine"). We disconnect a wire of "weight" from a hairpin of fastening of the distributor of ignition and the low-voltage wire connecting the coil to the ignition distributor (see. "Removal of the distributor of ignition"). We take out the central high-voltage wire from an ignition distributor cover (see. "Removal of a cover of the distributor of ignition"). We disconnect wires from the generator (see. "Removal and dismantling of the generator 37.3701"), the oil pressure sensor (see. "Removal of the sensor of pressure of oil") and the sensor of temperature of cooling liquid (see. "Replacement of the sensor of temperature of cooling liquid for a combination of devices on the car with the VAZ-2106 engine").

We fix cables of the lifting device on the engine: in a forward part — for the eye established on the right on a head of the block of cylinders, and in back — for an eye on the block of cylinders at the left (this eye should be installed on the block of cylinders after dismantle of the transmission again).

We turn off nuts of bolts of fastening of pillows of forward support of the power unit to arms of the block of cylinders (see. "Removal of support of the power unit on the car with the VAZ-2106 engine"),

We take out the engine from a motor compartment.

We install the engine in the return sequence.


"previous page
3.23. Dismantle of conrod and piston group on the car
following page"
3.25. Dismantling and assembly of the engine