Service of IZh 2126
1. General information
2. Engine UEPA-331
3. VAZ-2106 engine
4. Cooling system
5. Power supply system
6. Carburetor
7. System of ignition of the engine UEPA-331
8. System of ignition of the VAZ-2106 engine
9. System of production of the fulfilled gases
10. Coupling
11. IZh-2126 transmission
12. VAZ-21074 transmission
13. Cardan transfer
14. Zadny Bridge
14.1. Description of a design
14.2. Replacement of oil in the back bridge
14.3. Removal of a half shaft and replacement of an epiploon
14.4. Replacement of an epiploon of the leading gear wheel of the main transfer
14.5. Removal of a beam of the back bridge
14.6. Dismantling and assembly of a reducer of the back bridge
15. Forward suspension bracket
16. Back suspension bracket
17. Steering
18. Brake system
19. Electric equipment
20. Body
21. System of ventilation and heating
22. Features of a design of the IZh-2717 car
23. Appendix
24. Care of a car body
 






b678569c



14-3-snyatie-poluosi-i-zamena-salnika.html

14.3. Removal of a half shaft and replacement of an epiploon

We hang out and remove a back wheel. We remove back brake shoes (see. "Replacement of back brake shoes").

Head "on 14" with the extender through one or the other big openings in a flange of a half shaft we turn off four bolts of fastening of a plate of a half shaft and a brake board to a flange of a beam of the back bridge.

We take out bolts together with spring washers.

Holding a brake board that it did not hang on a tube of the brake cylinder, we lower it a little...

... and by the crosswise screw-driver it is turned off two screws of fastening of a brake board to a half shaft plate (from a reverse side of a board).

If it was not succeeded to unscrew these screws, see the second way of removal of a half shaft (lower).

That the brake board did not hang on a brake tube, we pass a bolt of M8 through one of its top fixing openings and we insert it into the corresponding opening of a flange of a beam.

We turn a half shaft plate...

... we roll two bolts of M 12x1,25 with a length of carving part not less than 80 mm diametrically located openings of fastening of a wheel against the stop in a brake board near openings in a beam flange.

Alternately wrapping bolts...

... we press off and take out a half shaft.

It is possible to dismantle a half shaft also, having used a wheel as a shock stripper. We wrap two bolts 100-150 mm long in nave openings, having passed them through wheel openings...

... and, having undertaken a wheel, by breakthrough it is shifted and we take out a half shaft.

If it was not succeeded to unscrew two screws of fastening of a brake board to a half shaft plate, then the half shaft should be removed together with a brake board. For this purpose we disconnect a brake tube from the back wheel cylinder (see. "Replacement of the back wheel cylinder") and fastening of a back tip of a cover of a branch of a cable of the parking brake to a brake board (see. "Adjustment and removal of knots of the parking brake system"). Using a wheel as a shock stripper...

... we shift and remove a half shaft together with a brake board.

Pay attention: at the Izh-2126 car of a half shaft of different length (right is shorter).

We hook an epiploon an assembly shovel...

... also we take out it.

Suitable piece of a pipe we press a new epiploon.

At deformation of a half shaft, wear of its shliyets, and also wear of the bearing we replace a half shaft on new assembled with the bearing and a locking ring (independently it is not recommended to replace the bearing or a locking ring).

We establish a half shaft assembled in the return sequence.


"previous page
14.2. Replacement of oil in the back bridge
following page"
14.4. Replacement of an epiploon of the leading gear wheel of the main transfer