Service of IZh 2126
1. General information
2. Engine UEPA-331
3. VAZ-2106 engine
4. Cooling system
5. Power supply system
6. Carburetor
7. System of ignition of the engine UEPA-331
8. System of ignition of the VAZ-2106 engine
9. System of production of the fulfilled gases
10. Coupling
11. IZh-2126 transmission
12. VAZ-21074 transmission
13. Cardan transfer
14. Zadny Bridge
15. Forward suspension bracket
16. Back suspension bracket
16.1. Description of a design
16.2. Removal of the shock-absorber
16.3. Removal of a spring
16.4. Removal of the top bar
16.5. Removal of the lower bar
16.6. Removal of a cross bar
17. Steering
18. Brake system
19. Electric equipment
20. Body
21. System of ventilation and heating
22. Features of a design of the IZh-2717 car
23. Appendix
24. Care of a car body
 






b678569c



16-3-snyatie-pruzhiny.html

16.3. Removal of a spring

We perform work on a viewing ditch or the elevator.

On a beam of the back bridge we disconnect the lower fastening of the shock-absorber from arms (see. "Removal of the shock-absorber"), the lower end of a rack of the regulator of pressure of back brakes (see. "Removal of the regulator of pressure of back brakes and its drive") and the lower bar (see. "Removal of the lower bar"). Instead of the lower bar it is possible to disconnect top - from an arm on a body longeron (see. "Removal of the top bar").

During the work on a viewing ditch we hang out a back part of a car of the mobile.

We take out a spring together with a metal cup.

We remove a cup.

From deepening in a basic cup on a beam of the back bridge we take out the lower (plastic) laying.

We remove the top (rubber) laying from a compression buffer arm.

For replacement of the buffer of the course of compression...

... we hook it the screw-driver...

... also we take out from an arm opening.

Before installation of the buffer we grease its landing part with soap solution.

At installation of a spring...

... we put on it the top laying and a cup so that the end of the top round of a spring coincided with deepening of a cup.

We establish the lower laying of a spring in a basic cup of a beam so that...

... laying hollow.

... coincided with a ledge of a basic cup.

The top end of a spring with laying and a cup is put on a compression buffer arm...

... also we enter the lower round of a spring into deepening of the lower laying (it is for descriptive reasons shown on the removed details).

The emphasis brought under a beam we squeeze a spring, checking correctness of its installation, and we fix bars and the shock-absorber to beam arms.


"previous page
16.2. Removal of the shock-absorber
following page"
16.4. Removal of the top bar